Linear Programming Problem


ampbuster

Recommended Posts

Hi guys,

I have a problem here:

 

There are 3 beams:

4000mm, 5000mm and 6000mm in length.

 

There are 4 cuts to be made to these beams:

2700mm, 3000mm, 2300mm, 1000mm.

 

The best solution is:

4000mm beam -> 3000mm, 1000mm

5000mm beam -> 2700mm, 2300mm

6000mm beam left untouched

 

Therefore, there is no wastage.

 

Can anyone come up with a solution to find the best way to cut the beams so that there is least wastage?